BIOROCK-S Installation in Berkshire

BIOROCK-S Installation in Berkshire

Location

Maidenhead, Berkshire

Project

2 Bedroom Annex with Studio.

System

BIOROCK-S System with ST1-2000 Primary Tank & BIOROCK-S Treatment Unit

Background

The client had the option to connect to the mains but the costs, permitting time and access permits proved prohibitive. As the plant was to be located quite close to the building the client also wanted a plant without noise and with minimum maintenance. It was also planned to discharge to a nearby stream and required a high quality final effluent.

Installation

Installation was carried out by the clients contractor under the supervision of a BIOROCK engineer and was completed in less than 2 days.

Wilt u contact met een BIOROCK specialist?

Hallo, mijn naam is José Manuel Rodríguez , International Sales Director bij BIOROCK. Neem gerust contact met mij op voor deskundig advies en een eventuele offerte.

Waar bent u gevestigd

Waar bent u?

Uw contactgegevens

De landcode wordt automatisch ingesteld nadat u uw land heeft gekozen

Waar bent u in geïnteresseerd?

Als u voor overige hebt gekozen geef dan aub aan wat u aan ons wilt vragen

Hoe kunnen wij u helpen